![GB50403-2007炼钢机械设备工程安装验收规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/829/33688829/b_33688829.jpg)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
Ⅰ Dominant Items
9.7.1 The tightening force to connect bolts of rotary portal frame shall comply with the requirement of the design technical document.
Quantity to be checked:100%.
Inspection method:Observe,check with a torque wrench,and check the record of tightening force.
Ⅱ General Items
9.7.2 The allowable deviation for installation of furnace cover,electrode rotating mechanism and furnace cover lifting mechanism shall comply with the requirements in Table 9.7.2.
Quantity to be checked:100%.
Inspection method:See Table 9.7.2.
Table 9.7.2 Allowable deviation for installation of furnace cover,electrode rotating mechanism and furnace cover lifting mechanism
![img](https://epubservercos.yuewen.com/5DC1A6/18000635001102306/epubprivate/OEBPS/Images/txt009_9.jpg?sign=1738984306-mgPrh6bHHrpfjFgy9wo24zkhTyTQweA9-0-61610fe66ce3c5b3111b1cfd0fd8b409)